Before you start
- What goes in
- The structure, size, base stock, press sheet, finished quantity, spoilage allowance and supplier rates.
- What comes out
- Blanks per sheet and sheets needed for each part, with stock, setup, press and tooling totals and an editable Studio layout.
A practical example
437 telescope boxes on B2 stock
Use the FEFCO 0309 telescope recipe at 267 × 179 × 63 mm inside, SBS 350 and B2 stock. At 7.5% overs, the two-up base and two-up lid each need 235 sheets.
Step-by-step walkthrough
Size the exact construction
Choose a structure and enter its dimensions and base stock. A link from a dieline preset also carries its structural options. Read the dimension reference and confirm that every manufactured part appears in the table.
Set the press sheet and order
Choose the press sheet your converter can run. Enter the number of complete packs and the overs allowance. Check blanks per sheet for every part. The calculator uses the selected sheet grain and press margins.
Enter stock, press and tooling rates
Enter a sheet price for each blank run, a setup per layout, the press cost per sheet and the tooling rate per metre of unique rule. Use one currency throughout. Leave a price blank until you know it, or enter zero for a charge the converter has waived.
Review the run estimate and inspect the layout
Check the known subtotal, complete run estimate and cost per finished pack. Select the part name to open that blank in the Studio sheet layout. Take the calculator rates into your quote separately and confirm the layout and shipment costs with your supplier.
Options at a glance
| Control or choice | What it changes | How to use it well |
|---|---|---|
| Press sheet | Stock dimensions, grain and standard press margins used to place the blanks. | Use the same stock the converter priced. If a blank is too large or only fits across the grain, confirm a feasible stock before estimating. |
| Finished quantity and overs | The order total and additional blanks planned for spoilage. | For a lid-and-base box, both runs need the full order quantity plus overs. |
| Setup per layout | One setup charge for each independently laid-out part. | Two separate runs use two setups. Inspect Studio when parts will run together on one shared stock. |
| Tooling per metre of rule | One tooling charge for the unique knife, crease and other rule length in each layout. | Ask whether the converter prices by rule length, a fixed die fee or an existing tool. Use the appropriate cost model for the quote. |
Work through the B2 estimate
For 437 boxes at 7.5% overs, round 469.775 up to 470 blanks for each part. Both parts fit two-up on the 707 × 500 mm B2 sheet. Allow 235 sheets for the base and 235 for the lid.
Use these practice rates in one currency. The base stock is 1.50 per sheet, the lid is 3.25 per sheet, setup is 12 per layout and the press rate is 0.20 per sheet. At 2.50 per metre, the approximately 12.727 m of combined layout rule costs 31.818.
Stock is 1,116.25, setup is 24 and the press run is 94. The complete estimate is 1,266.068, or 2.8972 per finished box. The per-box cost divides by the 437 ordered boxes. The separate overs allowance is already reflected in the sheet count.
- Load the exact FEFCO 0309 B2 recipeThe structure, board, sheet and order are filled. Enter the practice rates above.
Confirm the rest of the job with the converter
The estimate covers separate sheet runs. Include finishing, assembly, freight and tax in the supplier quote. If several parts share a sheet, continue in Studio to configure the combined run and check the stock and margins the converter requires.
Check your work
- The sheet, board and grain match the quoted stock.
- The order and overs apply to each part.
- Every charged rate uses the same currency.
- The separate layouts match the way the converter will run the job.
Troubleshooting
The calculator shows Waiting for prices
Complete the stock rate for each part and the setup, press and tooling rates. Enter zero for a rate that really is zero.
A blank will not fit on the chosen sheet
Compare blank size and grain with the available stocks. If the work requires a custom sheet or margin, open the recipe in Studio and confirm the layout with the converter.
The lid and base will share one sheet
Use Studio to plan the combined run. Reprice stock, setup and tooling for the resulting layouts.